Looking forward for a challenging position to cover wide range of responsibilities, where in my knowledge, skills are enhanced and experience can be utilized in the perspective development of the organization .To achieve the objective of my profession by assuring the optimum quality and aspects of company by the aid of theoretical & practical knowledge and also a good team leader who can face any challenge with a great confidence, for a mutual growth as a engineer in organization.
Ø Review comment sheet CRS for EPC submittal and reply to it within time frame.
Ø Attend client meeting for project progress and quality issue in daily and weekly basis.
Ø Assess and execute design changes and drawing releases, monitor work should be done according to update revision.
Ø Determines project schedule by studying project plan and specifications, calculates time requirements, sequences project elements.
Ø Attend daily weekly company management and client management meetings.
Ø Interacting daily with the clients to interpret their needs and requirements and representing them in the field
Ø Maintains project schedule by monitoring project progress, coordinating activities, and resolving problems.
Ø Controls project plan by approving expenditures and administering contractor contracts.
Ø Prepares project status reports by collecting, analyzing and summarizing information and trends and recommending actions.
Ø In charge of mechanical activities for potable water tanks, flushing tank, firefighting tank, post treatment area potable water pump house, In charge of all GRP line excavation, dewatering, backfilling work, Lime saturator, Lime preparation, CO2 systems and underground drainage systems.
Ø Assess and execute design changes and drawing releases, monitor work should be done according to update revision.
Ø Confirms product performance by designing and conducting tests.
Ø Determines project schedule by studying project plan and specifications, calculates time requirements, sequences project elements.
Ø Attend daily weekly company management and client management meetings.
Ø Interacting daily with the clients to interpret their needs and requirements and representing them in the field
Ø Maintains project schedule by monitoring project progress, coordinating activities, and resolving problems.
Ø Controls project plan by approving expenditures and administering contractor contracts.
Ø Prepares project status reports by collecting, analyzing and summarizing information and trends and recommending actions.
JOB PROFILE:- ESP, FGD , Ash handling system, ID and FD-Fan, APH in charge.
COMPANY:-SEPCO-III Electrical power Construction Corporation
COMPANY PROFILE: - Designs and builds power generation and transmission infrastructure
Manage all activities of ESP and Ash handling system
Co-ordinate vender and subcontractor for execute work as per drawing and standards.
Ensure compliance with site safety rules and local management instructions.
Ensure availability of materials and update of material for works to be carried out.
Provide support with problem solving and modifications to the Engineering infrastructure
Make time to understand the FGD, ESP and ash handling system Planners Role and become proficient to provide absence cover.
Ø Provide supervision for fabrication of HFO storage tanks, installation of piping lines from birth to tanks farm and pump house.
Ø Supervision to installation of marine loading arm (MLA) and co-ordinate with MLA vender.
Ø Provide technical support to external design resources, equipment vendors, and fabricators Travel to fabrication shops for meetings, inspections and functional tests, and to customer site for vessel loading activities.
Ø Review and confirm code basis for each project Collaborate with other project team members to comply with project requirements and meet project schedules.
Ø Provide direction to fabricators and inspectors with applicable assistance Review and approve fabricator and external design drawings, documentation and fabrication sequence.
Familiar with Review as-built drawings (P&ID, Isometrics, GA’s, Tie-ins list, Supports Details, orientation drawings and vendor drawings)
Piping spool check before erection on site.
Coordination with Clint, PMC, Sub-contractors in meetings all pre-inspection meeting work at Daily, Weekly and monthly for proper updates.
Monitoring the site fabrication of oil and water tank insure that work is as per latest drawings.
Checking the dimension of plate and edge preparation for joint.
Fully involved in the Inspection of site fabricated Oil and Water Storage tanks which includes Peaking & bending of installed shells, welding inspection, marking up for the nozzle orientation, vacuum box testing for the bottom plate & annular plate, Installation of roof plates and rafters ,pneumatic testing of roof plate & nozzle reinforcement pads.
Monitoring and inspecting the prefabrication works by the contractors including the inspection of incoming materials, material handling, heat number transfer, Fit-up, welding activities, Post weld heat treatment (PWHT) of welding joints, hardness test, PMI (Positive material identification), reinforced pad test.