.Leading Work Team at Site **
Establishing High Accuracy Control Points Either by**
.Traverse or Triangulation Method
Matching Structural Drawing with Architectural Drawing to**
Ensure That The Work Is Going in The Right
.Receipt of the Location from the Consultant**
Coordinating With Other Disciplines**