In a shoiba Power plant There was installation of environment device and tubing
In Hafar #3 sub station and Qaisuma here is same breaker change into new one 115Kv
In a Ghazlan Power Plant there was work for change the breaker 115kv and installing, With jumpers
In a Riyadh there was Two projects we handled, There was my job for Environmental systems
In a Power plant #7 Riyadh there was shut down for bus bar, so there was my activity of control cables, and removing old breaker and cables
I was supervising there in lighting, installing, cables, and testing